Heat Size Upgrade In Kroman Çelik Eaf

Associacao Brasileira de Metalurgia,  Materiais e Mineracao
Alberto Pesamosca
Organization:
Associacao Brasileira de Metalurgia, Materiais e Mineracao
Pages:
8
File Size:
2555 KB
Publication Date:
Jul 30, 2018

Abstract

The paper presents the results obtained by the AC EAF supplied by Danieli at Kroman Çelik (Gebze-Turkey) after the planned upgrade to 150 ton. The EAF – 7,4 m diameter, based on the full platform standard design - is able to handle a maximum power of 114 MW and is equipped with the most advanced and reliable technology, including module injection system and the Hireg electrodes regulation system. Excellent results were already obtained with 120 heat size in terms of fast start-up and excellent performance figures. After the upgrade, productivity was increased up to 212 t/h, maintaining high process efficiency (365 kWh/t with 32,1 Nm3/t O2).
Citation

APA: Alberto Pesamosca  (2018)  Heat Size Upgrade In Kroman Çelik Eaf

MLA: Alberto Pesamosca Heat Size Upgrade In Kroman Çelik Eaf. Associacao Brasileira de Metalurgia, Materiais e Mineracao, 2018.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account