Growth of the Electric Power System of the Union Pacific Coal Company, Rock Springs, Wyoming

- Organization:
- Rocky Mountain Coal Mining Institute
- Pages:
- 5
- File Size:
- 648 KB
- Publication Date:
- Jan 1, 1921
Abstract
The use of electric power was introduced in this field in the year 1892. The initial installation being an engine-driven generator and one nine-ton haulage locomotive using 500-volts direct current. Reference to this locomotive appears in the issue of COAL AGE for February 24, 1921. For a large coal field, the conversion to electricity has been very complete, there being no compressed air machines in service and but one steam driven hoist, that at No. 1o mine and located within fifty feet of the present power plant boiler room. Two eight-ton haulage locomotives, installed in 1896 and still in use, justifies the service and the equipment. These mines used the pioneer types of electric cutting and drilling machines, the story of which is, no doubt, familiar to you. The extensive use of electric power began in 1900, when there was installed four 400 k.w., 500-volt direct current engine-driven generators. These were cross-compound machines and operated non-condensing. By 1910 the mines had developed main haulage entries of several miles in length and a working territory of about six square miles in area. The necessity of supplying adequate power at the working face required a local power supply from motor-generator sets in various parts of the mine to supplement the power furnished by the engine-driven generators. The power to these motor-generator sets was supplied by a 300 k.w. high pressure non-condensing turbo-generator delivering 2300 volts, 60 cycle, three-phase current. This marks the beginning of the use of alternating current for mining purposes. In 1913 new mines were being developed at Reliance, seven miles distant, and the plant was enlarged to accommodate a 750 k.w. low pressure, condensing turbine, utilizing the exhaust steam from the cross-compound engines and the 300 k.w. turbine. Transformers were installed for supplying Reliance with power at 13,200 volts. In the course of time the old engines began to dismantle themselves by throwing various pieces, such as cylinder heads, about the building, damaging walls and switchboards, and created a general feeling of unrest among those who had to do with power production. The limitations of the old engines that had given admirable service for ten years were recognized. The source of exhaust steam became questionable and in 1915, a 1000 k.w. high pressure condensing turbine was installed in order that a more general use could be made of motor-generator sets for the direct current supply. The plant at that time containing a 1000 k.w., a 750 k.w., and a 300 k.w., in alternating current generators, supplemented
Citation
APA:
(1921) Growth of the Electric Power System of the Union Pacific Coal Company, Rock Springs, WyomingMLA: Growth of the Electric Power System of the Union Pacific Coal Company, Rock Springs, Wyoming. Rocky Mountain Coal Mining Institute, 1921.