Ground Improvement Resulting From Installation Of Drilled Displacement Piles

Deep Foundations Institute
Timothy C. Siegel
Organization:
Deep Foundations Institute
Pages:
8
File Size:
278 KB
Publication Date:
Jan 1, 2007

Abstract

Drilled displacement piles (also known as augered cast-in-place displacement piles or augured, pressure grouted displacement piles) are installed by the displacement of soil and subsequent placement of fluid cement grout within the evacuated volume. Depending on the soil grain-size characteristics, soil behavior, in situ soil density, pile spacing, and pile diameter, the installation process can result in measurable densification and an increase in lateral stress. This paper examines the conditions prior to and following the installation of drilled displacement piles at sandy sites using the cone penetration test. The data support that the installation of drilled displacement piles results in a substantial increase in tip resistance.
Citation

APA: Timothy C. Siegel  (2007)  Ground Improvement Resulting From Installation Of Drilled Displacement Piles

MLA: Timothy C. Siegel Ground Improvement Resulting From Installation Of Drilled Displacement Piles. Deep Foundations Institute, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account