Formwork Solutions for the Final Lining of the Kramertunnel, Germany - RETC2023

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 14
- File Size:
- 259 KB
- Publication Date:
- Jun 13, 2023
Abstract
The city of Garmisch-Partenkirchen in southern Germany is located at a main transit
road to Tyrol in Austria and suffers of a very heavy traffic load. Therefore, the
Kramertunnel as a by-pass tunnel is built to release/mitigate the traffic through the
city centre. The 3,600 m long single tube road tunnel is designed with a parallel but
smaller emergency tunnel and with cross passages, fitted with single- and doublesided
emergency bays, a vent shaft, and an intermediate ceiling to separate fresh air
supply from the road traffic. The tunnel, concrete lined along its entire length provided
the challenge to find smart formwork solutions for quick set-up, repositioning, setup
and pouring. Three particularly specific sections are discussed in this paper.
Citation
APA:
(2023) Formwork Solutions for the Final Lining of the Kramertunnel, Germany - RETC2023MLA: Formwork Solutions for the Final Lining of the Kramertunnel, Germany - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.