Expansion Project And Progress In The Sumitomo Metal Mining Toyo Smelter And Refinary

The Minerals, Metals and Materials Society
H. Kurokawa
Organization:
The Minerals, Metals and Materials Society
Pages:
12
File Size:
722 KB
Publication Date:
Jan 1, 2006

Abstract

Sumitomo Metal Mining decided to expand copper production capacity of Toyo Smelter and Refinery to cope with the recent copper demand growth in Asia, and to survive by reducing cost. The expansion plan is promoted to increase electrorefined copper production capacity from 270,000 metric tons in 2001 to 450,000 metric tons in 2007. The major changes in smelting section are introduction of the rotary steam dryer, renewal of the feeding system for flash furnace, improvement of the concentrate burner, modification of the flash furnace cooling materials, renewal of the slag cleaning furnace, modification of the flash furnace waste heat boiler, installment of a new converter furnace, enlargement of two anode furnaces. In addition, the gas cleaning system was upgraded and the second acid plant was installed. In the refinery section, the existing tank houses have been operated at high current density of 300A/m2 using the conventional starting sheet cathode technology and moreover a new tank house utilizing the permanent cathode technology was constructed. Although the copper production capacity has been increased, SO2 emission has been kept the lowest in the world through consideration of influence on the environment by expansion project.
Citation

APA: H. Kurokawa  (2006)  Expansion Project And Progress In The Sumitomo Metal Mining Toyo Smelter And Refinary

MLA: H. Kurokawa Expansion Project And Progress In The Sumitomo Metal Mining Toyo Smelter And Refinary. The Minerals, Metals and Materials Society, 2006.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account