Expansion Of the Copper Smelter In Huelva

- Organization:
- The Minerals, Metals and Materials Society
- Pages:
- 10
- File Size:
- 371 KB
- Publication Date:
- Jan 1, 1998
Abstract
This paper discusses the revamp and expansion of Atlantic Copper's (formerly Rio Tinto Metal) copper smelter located at Huelva, Spain. The plant was expanded from 150,000 to 270,000 tpy new copper in anodes, and from 133,000 to 215,000 tpy cathodes. Lurgi successfully executed this contract on a lump-sum, turnkey basis in just 19 months. The Lurgi on-site task force performed this work in close cooperation with Atlantic Copper's personnel, with a minimum of disruption in the plant's ongoing operation. The contractual performance parameters were achieved to the client's satisfaction shortly after the mechanical completion of the respective plant sections.
Citation
APA:
(1998) Expansion Of the Copper Smelter In HuelvaMLA: Expansion Of the Copper Smelter In Huelva. The Minerals, Metals and Materials Society, 1998.