Draw Point Construction Improvement at Deep Mill Level Zone (DMLZ) Pt Freeport Indonesia using Six Sigma Method

Society for Mining, Metallurgy & Exploration
A. Parhusip F. Hartono M. Siray R. Mulyanto
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
6
File Size:
894 KB
Publication Date:
Jan 1, 2016

Abstract

"PT Freeport Indonesia is preparing the Deep Mill Level Zone (DMLZ) mine to be the successor of the currently operating Deep Ore Zone (DOZ) mine. The DMLZ is block cave mine situated 500 m below the DOZ mine and approximately 1600 m depth from surface. Both of the block caving mines require draw point construction in the extraction level to extract the ore from caved area above. Learning from the experience in DOZ, the construction & maintenance of draw points in the production panels is a significant challenge in supporting consistent production.The average DOZ draw point construction duration is approximately 46 shifts per draw point. The time frame for construction is dependent on several variables; availability of the conventional forming system, material availability, and development tolerances. The repair of concrete floors and lintel sets causes production downtime. Reviewing the old DOZ draw point design, there is an opportunity to increase constructability, durability, and reliability of DMLZ draw points. This paper discusses how the DMLZ has improved draw point construction productivity and is on track to significantly reduce costs whilst increasing the quality by using the Six Sigma Improvement Method.Introduction The DMLZ Mine is part of the PT. Freeport Indonesia (PTFI) future Expansion to its underground mining complexes. It is the fourth vertical lift in the East Ertsberg Skarn System (EESS) deposit (Figure 1).Currently, it is under development phase.The DMLZ mine will be a block cave mine using an advanced undercutting method. The DMLZ extraction level will be approximately 1,600 meters below the surface on the 2570 level with column heights of roughly 500 m. The Undercut is on 2590 level, some 20 meters above the extraction level."
Citation

APA: A. Parhusip F. Hartono M. Siray R. Mulyanto  (2016)  Draw Point Construction Improvement at Deep Mill Level Zone (DMLZ) Pt Freeport Indonesia using Six Sigma Method

MLA: A. Parhusip F. Hartono M. Siray R. Mulyanto Draw Point Construction Improvement at Deep Mill Level Zone (DMLZ) Pt Freeport Indonesia using Six Sigma Method. Society for Mining, Metallurgy & Exploration, 2016.