Distributed Digital Control At Cuajone - Summary

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 671 KB
- Publication Date:
- Jan 1, 1986
Abstract
The commissioning of a Distributed Digital Control. System for the grinding circuit at Cuajone, was completed by mid August, 1985. Development of a successful strategy, excellent operator acceptability and the visual aspects offered by the display of the central console, improved mill throughput significantly. The inherent features of a digital system enhanced the flexibility in grinding control and allowed the mills and classifiers to be operated at maximum capacity. This paper discusses in detail the strategy development, the production restrictions encountered, and evaluates the overall performance of the digital control system. 1.0 Introduction In November 1976, the Cuajone Concentrator, located on the western slope of the Andes in Southern Peru, was commissioned to treat a nominal 41,000 TPD of ore. A systematic elimination of production restrictions has resulted in a continual increase of concentrator throughput to 48,700 TPD before the grinding control was in- stalled.
Citation
APA:
(1986) Distributed Digital Control At Cuajone - SummaryMLA: Distributed Digital Control At Cuajone - Summary. Society for Mining, Metallurgy & Exploration, 1986.