Development of Yubari New Coal Mine

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 26
- File Size:
- 764 KB
- Publication Date:
- Jan 1, 1976
Abstract
INTRODUCTION In this gapes, the author will describes to development of Yubari New coal mine. The construction set about since October 1970, and commenced from June 1975 in winning. Especially, descrives to compare with the studies at planning stage, and the experiences at under construction. The problems for development are next four: 1) There were no outcrop of the coal bearing strata, but the development was instituted against the deep coal seam occurrence at 800 m below the surface. 2) In order to the coal seams occured the deep level from the surface, threr had very difficult problems, i.e. temperature, earth pressure, methane etc. The countermeasure to solved them, were foundation of the development. 3) The construction was afflict with the inundation in high pressure, due to cement grouting and excavating alternately, overcame the difficulties. 4) The construction was finished by the encourage of national investment, in spite of the enterprise was weaken constitution from the energy revolution since 1960's. OUT LINE OF YUBARI NEW COAL MINE Geography Situation. Ishikari coal field is situated the west side of the Hidaka mountains, where runs north to south at center of Hokkaido, northern district of Japan. It's width is 40km in east and west, and length is 110km in north and south.
Citation
APA:
(1976) Development of Yubari New Coal MineMLA: Development of Yubari New Coal Mine. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1976.