Development of Grade Control Systems at the Mt Muro Au-Ag Project, Central Kalimantan, Indonesia

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
692 KB
Publication Date:
Jan 1, 1997

Abstract

The Mt Muro gold and silver deposit in Central Kalimantan has been in production since December 1994. The geology is characterised by narrow high-grade lodes containing gold and significant amounts of silver. From a largely untrained workforce in the grade control department, production per crew and per geologist has tripled during the three years of production. Grade control drilling evolved from blast hole sampling to reverse circulation sampling. National geologists are trained in basic modeling procedures. A fully integrated reporting and reconciliation system was programed and implemented.
Citation

APA:  (1997)  Development of Grade Control Systems at the Mt Muro Au-Ag Project, Central Kalimantan, Indonesia

MLA: Development of Grade Control Systems at the Mt Muro Au-Ag Project, Central Kalimantan, Indonesia. The Australasian Institute of Mining and Metallurgy, 1997.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account