Determination of Mineral Processing Flow Sheet in Yichun Tantalum-niobium Mine

International Mineral Processing Congress
C. L. Xiao
Organization:
International Mineral Processing Congress
Pages:
7
File Size:
255 KB
Publication Date:
Jan 1, 2014

Abstract

With reference to the test report carried out by Guangzhou Nonferrous Metal Research Institute in 1983, the mineral process flow sheet of Yichun Tantalum-niobium mine is determined based on the characters of ores and successful experiences in light of the problems in the existing flowsheet: The ore is desilted before crushing; the primary slime is separately treated; the staged grinding process used while the fine slime is collectedly treated with tantalum and niobium as the main recoveries and lepidolite and feldspar powder as the secondary. The flowsheet is featured by comprehensive recovery, low investment and low energy cost.
Citation

APA: C. L. Xiao  (2014)  Determination of Mineral Processing Flow Sheet in Yichun Tantalum-niobium Mine

MLA: C. L. Xiao Determination of Mineral Processing Flow Sheet in Yichun Tantalum-niobium Mine. International Mineral Processing Congress, 2014.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account