Design Of A Preparation Plant For Minimum Maintenance And Clean Up

Society for Mining, Metallurgy & Exploration
Donald H. Dowlin
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
9
File Size:
1526 KB
Publication Date:
Jan 1, 1962

Abstract

The design of a preparation plant for minimum maintenance and clean up requires both the skills of the Engineer and the practical experience of the Operator. From the initial flow sheet and preliminary design until the plant is completed and operating, each phase of the work must be thoroughly explored for simplicity, workability and high efficiency. It is the responsibility of the Designing Engineer to develop the plant around the basic flow sheet, selecting equipment and materials not only with regards to Initial cost but also required upkeep and repair.
Citation

APA: Donald H. Dowlin  (1962)  Design Of A Preparation Plant For Minimum Maintenance And Clean Up

MLA: Donald H. Dowlin Design Of A Preparation Plant For Minimum Maintenance And Clean Up. Society for Mining, Metallurgy & Exploration, 1962.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account