Design Development of the I-35 Capital Express Central Drainage Tunnels - NAT2024

Society for Mining, Metallurgy & Exploration
James Parkes Mark Kroncke Joseph Goessling
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
806 KB
Publication Date:
Jun 23, 2024

Abstract

The I-35 Capital Expressway (CapEx) Central Drainage Tunnels will serve as a stormwater collection system for the forthcoming I-35 Capital Express Central reconstruction project through downtown Austin, Texas. The schematic level concept design included three tunnels, 10 to 14 ft ID, totaling 26,000 LF. Constructability reviews during design development indicated issues with the concept design including phasing of construction, con􀃀icts with future retaining walls, staging area concerns, and signi􀂿cant mixed face tunneling. The design was updated to mitigate these risks. The revised design includes two tunnels, both 22-ft ID and totaling 33,000 LF, that will be mined almost entirely in rock.
Citation

APA: James Parkes Mark Kroncke Joseph Goessling  (2024)  Design Development of the I-35 Capital Express Central Drainage Tunnels - NAT2024

MLA: James Parkes Mark Kroncke Joseph Goessling Design Development of the I-35 Capital Express Central Drainage Tunnels - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account