Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 18
- File Size:
- 6138 KB
- Publication Date:
- Dec 1, 2022
Abstract
The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover and mixed-face conditions and passes underneath the SkyTrain and MARTA stations and airport terminal buildings. It includes a twin tube Bifurcation with a span of over 45 feet and ground cover of 12 feet. A flat roof is being constructed at the Bifurcation to maximize rock cover and minimize surface settlements. This paper focuses on design and construction challenges for the Bifurcation and tunneling beneath the world’s busiest airport, while minimizing impacts to operations.
Citation
APA:
(2022) Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022MLA: Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022. Society for Mining, Metallurgy & Exploration, 2022.