Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022

Society for Mining, Metallurgy & Exploration
Yiming Sun John Murray Daniel Ebin Robert Gould Lizan Gilbert
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
18
File Size:
6138 KB
Publication Date:
Dec 1, 2022

Abstract

The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover and mixed-face conditions and passes underneath the SkyTrain and MARTA stations and airport terminal buildings. It includes a twin tube Bifurcation with a span of over 45 feet and ground cover of 12 feet. A flat roof is being constructed at the Bifurcation to maximize rock cover and minimize surface settlements. This paper focuses on design and construction challenges for the Bifurcation and tunneling beneath the world’s busiest airport, while minimizing impacts to operations.
Citation

APA: Yiming Sun John Murray Daniel Ebin Robert Gould Lizan Gilbert  (2022)  Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022

MLA: Yiming Sun John Murray Daniel Ebin Robert Gould Lizan Gilbert Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022. Society for Mining, Metallurgy & Exploration, 2022.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account