Daniel Island Surprise?Sand Lens Lurking In Cooper MARL, Charleston, SC

Society for Mining, Metallurgy & Exploration
Ray Brainard
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
399 KB
Publication Date:

Abstract

Charleston Water System?s Daniel Island Extension Tunnel, initially thought to be the simplest of the four replacement tunnels to design and build, became the most challenging after the discovery of an unexpected 30-ft thick lens of sand in the normally consistent Cooper Marl while sinking a shaft on Daniel Island. This paper will explore the challenges involved with determining the extent of the unforeseen lens of sand, the accelerated boring program, and the redesign of the vertical alignment?keeping the alignment between the sand layer and the bottom of the Cooper River. It will describe how the challenges were overcome, and how the Owner, Engineer, and Contractor were able to team together to achieve the desired results.
Citation

APA: Ray Brainard  Daniel Island Surprise?Sand Lens Lurking In Cooper MARL, Charleston, SC

MLA: Ray Brainard Daniel Island Surprise?Sand Lens Lurking In Cooper MARL, Charleston, SC. Society for Mining, Metallurgy & Exploration,

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account