Current Operation at La Caridad Smelter

- Organization:
- The Minerals, Metals and Materials Society
- Pages:
- 7
- File Size:
- 173 KB
- Publication Date:
- Jan 1, 1993
Abstract
La Caridad operated at only 65% of design capacity during the first five years of operation. After the first major shutdown and repairs to the furnace in mid- 1992, the smelter quickly reached 95% of design capacity. Converter operation is now more efficient; blowing times have decreased from about 1.7 to 1.2 min/ton of matte. Anode copper production is now 15000 tons/month. The increased efficiency provided by better coordination and scheduling ensures La Caridad's ability to operate at present and expanded production capacity while simultaneously meeting environmental control standards.
Citation
APA:
(1993) Current Operation at La Caridad SmelterMLA: Current Operation at La Caridad Smelter. The Minerals, Metals and Materials Society, 1993.