Crushing Developments at the Sierrita Concentrator

The American Institute of Mining, Metallurgical, and Petroleum Engineers
R. N. Woody S. J. Work
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
6
File Size:
867 KB
Publication Date:
Jan 4, 1979

Abstract

Crushing development at Duval Corp.'s Sierrita concentrator in Sahuarita, Ariz., has been a continuing effort since plant startup in January 1970. The original crushing system was designed to produce 65 000 t/d (72,000 stpd) of ore. However, in the summer of 1970 the Sierrita plant was averaging only 43 000 t/d (47,000 stpd) due to coarser than expected secondary crushing plant feed, lower than design crusher operating availability, and inability to achieve design tertiary crusher power draught at an acceptable hydraulic support pressure.
Citation

APA: R. N. Woody S. J. Work  (1979)  Crushing Developments at the Sierrita Concentrator

MLA: R. N. Woody S. J. Work Crushing Developments at the Sierrita Concentrator. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1979.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account