Abstract
This paper describes the driving of a 1421 m long by 2.74 m diameter sewer tunnel in postglacial soils of the Menomonee River Valley in Milwaukee, Wisconsin. An earth pressure balance machine was used for excavation and to install a "one pass" pre-cast concrete gasketed segmental liner. Also discussed is the use of ground freezing to stabilize the ground for the start of tunneling operations and modifications made to two structures to accommodate final tie-ins for the sewer tunnel.
Citation
APA: