Crosstown 5/6 Collector System Soft Ground Tunneling With An EPB Machine

Society for Mining, Metallurgy & Exploration
E. O. Mixon Joseph P. Sehulster
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
8
File Size:
588 KB
Publication Date:
Jan 1, 1989

Abstract

This paper describes the driving of a 1421 m long by 2.74 m diameter sewer tunnel in postglacial soils of the Menomonee River Valley in Milwaukee, Wisconsin. An earth pressure balance machine was used for excavation and to install a "one pass" pre-cast concrete gasketed segmental liner. Also discussed is the use of ground freezing to stabilize the ground for the start of tunneling operations and modifications made to two structures to accommodate final tie-ins for the sewer tunnel.
Citation

APA: E. O. Mixon Joseph P. Sehulster  (1989)  Crosstown 5/6 Collector System Soft Ground Tunneling With An EPB Machine

MLA: E. O. Mixon Joseph P. Sehulster Crosstown 5/6 Collector System Soft Ground Tunneling With An EPB Machine. Society for Mining, Metallurgy & Exploration, 1989.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account