Abstract
"The Contract C310 is part of the current biggest infrastructure project of Europe “Crossrail” which is a major new cross-London rail link project and comprises the construction of the North Woolwich Portal, Plumstead Portal and the twin tube Thames Tunnels with a length of approximately 2.6km. Two Mix-Shield TBMs (Diameter 7.12m) were driving through differing challenging ground conditions (Thanet Sand, Gravels, Flint and Chalk) below the ground water table. The two tunnels were underpassing several listed buildings, sensitive structures, operational railway tracks with low overburden and close to existing subway tunnels in an urban environment. Several additional measures as compensation grouting, micro piles and an intensive monitoring has been carried out to ensure a safe tunnelling process. PROJECT OVERVIEW CROSSRAIL Project Crossrail Crossrail is currently the biggest infrastructure project in Europe which has been developed to serve London and the southeast of England. The project includes the construction of twin-bore tunnels on a west-east alignment under central London and the upgrading of existing National Rail lines to the east and west of central London. The new rail track, as shown in Figure 1, starting in Shenfield/ Abbey Wood in the east of London and ending in Reading / Heathrow Airport in the west of London, includes the construction of nine central area stations, providing interchange with London Underground, National Rail and London Bus services, and the upgrading or renewal of existing stations outside central London.Altogether there will be 118km of new rail tracks, including 42km of tunnels and 40 train stations. After completion in 2018, Crossrail expects 200 million passengers per year (Tauriainen, Rädle, Ingram 2013)."
Citation
APA:
(2016) Crossrail C310 Thames Tunnel—Mixshield TBM Tunneling in Alternating Ground Conditions With Low OverburdenMLA: Crossrail C310 Thames Tunnel—Mixshield TBM Tunneling in Alternating Ground Conditions With Low Overburden. Society for Mining, Metallurgy & Exploration, 2016.