Critical Blast Design of a New York City Shaft and It's Effect on Vibration Control

- Organization:
- International Society of Explosives Engineers
- Pages:
- 10
- File Size:
- 263 KB
- Publication Date:
- Jan 1, 1989
Abstract
The New York City Department of Environmental Protection (DEP) is currently building City Water Tunnel #3 beneath the city. The purpose of this tunnel is to improve water distribution to the city and to allow the DEP to inspect the older tunnels and make the necessary repairs. These older tunnels have been in continuous operation since the early 1900's. Construction on the Third Tunnel is planned in four stages. The Nelson Street Shaft, which is the focus of this paper, is part of the second stage.