Critical Blast Design of a New York City Shaft and It's Effect on Vibration Control

International Society of Explosives Engineers
Eric Reale
Organization:
International Society of Explosives Engineers
Pages:
10
File Size:
263 KB
Publication Date:
Jan 1, 1989

Abstract

The New York City Department of Environmental Protection (DEP) is currently building City Water Tunnel #3 beneath the city. The purpose of this tunnel is to improve water distribution to the city and to allow the DEP to inspect the older tunnels and make the necessary repairs. These older tunnels have been in continuous operation since the early 1900's. Construction on the Third Tunnel is planned in four stages. The Nelson Street Shaft, which is the focus of this paper, is part of the second stage.
Citation

APA: Eric Reale  (1989)  Critical Blast Design of a New York City Shaft and It's Effect on Vibration Control

MLA: Eric Reale Critical Blast Design of a New York City Shaft and It's Effect on Vibration Control. International Society of Explosives Engineers, 1989.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account