Copper Telluride Recovery From Raw Slime at Copper Refinery

- Organization:
- The Minerals, Metals and Materials Society
- Pages:
- 11
- File Size:
- 339 KB
- Publication Date:
- Jan 1, 1990
Abstract
Tellurium in raw slime has recently been recovered as copper telluride in Onahama Smelter & Refinery. The slime is decopperized with sulfuric acid solution in conventional leaching tanks. The pregnant leach solution containing 45 g/l of copper and 1 g/l of tellurium is introduced to a copper telluride recovering reactor. The tail solution from the reactor containing less than 20 mg/l of tellurium is recycled directly to circulation tanks of copper electrolysis. The impurities of the product copper telluride is kept below 1% without any purification.
Citation
APA:
(1990) Copper Telluride Recovery From Raw Slime at Copper RefineryMLA: Copper Telluride Recovery From Raw Slime at Copper Refinery. The Minerals, Metals and Materials Society, 1990.