Controlled Blasting At The Hanging Lake Tunnels (a8565281-d84e-475e-9694-9445db5583d2)

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 519 KB
- Publication Date:
- Jan 1, 1991
Abstract
Hanging Lake Joint Venture recently excavated two conventional 12.8 m (42 foot) diameter highway tunnels in the difficult ground conditions of Glenwood Canyon, Colorado. This paper outlines the type and success of the various Controlled Blasting Techniques that were used to minimize overbreak in the portal and tunnel excavations. The different Smoothwall and Cushion Charge loads used in the different ground types are described in detail. Delay Timing and Drilling Pattern variations are also discussed.