Controlled Blasting at the Hanging Lake Tunnels

International Society of Explosives Engineers
Gordon F. Revey
Organization:
International Society of Explosives Engineers
Pages:
9
File Size:
204 KB
Publication Date:
Jan 1, 1991

Abstract

Hanging Lake Joint Venture recently excavated two conventional 42 foot diameter highway tunnels in the difficult ground conditions of Glenwood Canyon, Colorado. This paper outlines the type and success of the various Controlled Blasting Techniques that were used to minimize overbreak in the portal and tunnel excavations. The different Smoothwall and Cushion Charge loads used in the different ground types are described in detail. Delay Timing and Drilling Pattern variations are also discussed.
Citation

APA: Gordon F. Revey  (1991)  Controlled Blasting at the Hanging Lake Tunnels

MLA: Gordon F. Revey Controlled Blasting at the Hanging Lake Tunnels. International Society of Explosives Engineers, 1991.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account