Control of Induced Seismicity at El Teniente Mine, Codelco-Chile

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 7
- File Size:
- 559 KB
- Publication Date:
- Jan 1, 2000
Abstract
El Teniente Mine started the exploitation of the primary rock in the beginning of the 1980s decade, using caving methods. Since the beginning the mining activities have induced seismicity including some occasional rockbursts. Owing to the relevant damages, the mining operations were stopped in some production sectors. This paper describes the concepts that have been used in order to control the induced seismicity based on the strategies for controlling the rockmass breaking process, which depend on mining parameters. It also presents the main concepts applied in the Teniente Sub6 sector design and the experience collected during its sector exploitation.
Citation
APA:
(2000) Control of Induced Seismicity at El Teniente Mine, Codelco-ChileMLA: Control of Induced Seismicity at El Teniente Mine, Codelco-Chile. The Australasian Institute of Mining and Metallurgy, 2000.