Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam Injection

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 24
- File Size:
- 1121 KB
- Publication Date:
- Jan 1, 1995
Abstract
A twin tube tunnel of 2 000 meters long and an internal diameter of 6.90 m has been excavated through alluvial ground, with low overburden, using a 8.0 m diameter Earth Pressure Balanced tunneling machine with foam injection and extruded concrete behind segment.
Citation
APA:
(1995) Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam InjectionMLA: Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam Injection. Society for Mining, Metallurgy & Exploration, 1995.