Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam Injection

Society for Mining, Metallurgy & Exploration
P. Marcheselli Jean-Yves Peron
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
24
File Size:
1121 KB
Publication Date:
Jan 1, 1995

Abstract

A twin tube tunnel of 2 000 meters long and an internal diameter of 6.90 m has been excavated through alluvial ground, with low overburden, using a 8.0 m diameter Earth Pressure Balanced tunneling machine with foam injection and extruded concrete behind segment.
Citation

APA: P. Marcheselli Jean-Yves Peron  (1995)  Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam Injection

MLA: P. Marcheselli Jean-Yves Peron Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam Injection. Society for Mining, Metallurgy & Exploration, 1995.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account