Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, Malaysia

Deep Foundations Institute
Vijayakumar Viramuthu Martin Heinrich
Organization:
Deep Foundations Institute
Pages:
9
File Size:
2412 KB
Publication Date:
May 1, 2022

Abstract

Tower of Lot L, L1 & M, Kuala Lumpur City Centre when completed would stand 700 m tall. This Mega tall Skyscraper would merely be less than 500 m away from the world tallest Twin Tower, the Petronas Twin Tower. From June 2018 to February 2020 BAUER (MALAYSIA) SDN. BHD. constructed 225 nos bored piles with diameters of 2.0 m and 2.5 m for this tower. To comply with the depth requirement of the initial design and the need to have the pile toe 2.0 m above competent bedrock, the drilling equipment was required to be able to achieve a maximum drilling depth of 150 m. Actual piles constructed on site were deeper than 120 m. These dimensions caused superlative challenges which included but were not limited to controlling the open borehole stability over time with polymer, installing 70 t heavy steel cages and pouring up to 550 m³ concrete continuously in conjunction with installation of 88 t heavy kingposts into workable fresh concrete. The piling works were executed with one BAUER BG 48 and one BG 72, the biggest drilling rig globally available.
Citation

APA: Vijayakumar Viramuthu Martin Heinrich  (2022)  Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, Malaysia

MLA: Vijayakumar Viramuthu Martin Heinrich Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, Malaysia. Deep Foundations Institute, 2022.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account