Construction Of Section E-ld Greenbelt Route Tunnels, Washington, DC

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 11
- File Size:
- 675 KB
- Publication Date:
- Jan 1, 1985
Abstract
Mergentime/Loram's extension of the Washington, DC Metro Subway System includes construction of dual 1,770-foot tunnels in soft ground, a crossover structure, a fan structure and pumping station, and other related work. This paper describes the overall construction requirements of the Contract, including subsurface conditions; Mergentime's value engineering of the tunneling and compressed air contract requirement; selection of the tunnel boring machine and backup equipment; installation of the compressed air plant; the manufacture, use and evaluation of the tunnel liners; and the tunneling performances during construction of the first tunnel.
Citation
APA:
(1985) Construction Of Section E-ld Greenbelt Route Tunnels, Washington, DCMLA: Construction Of Section E-ld Greenbelt Route Tunnels, Washington, DC. Society for Mining, Metallurgy & Exploration, 1985.