Construction Challenges of the Anderson Dam Tunnel Project - NAT2022

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 4024 KB
- Publication Date:
- Dec 1, 2022
Abstract
The Anderson Dam Tunnel Project is a high-priority, urgent project under construction by the Santa Clara Valley Water District in California. The project will provide a new low-level outlet for the Anderson Reservoir enabling the seismic retrofit of the Anderson Dam as mandated by the Federal Energy Regulatory Commission. This paper describes planning for construction of the tunnel through the dam’s right abutment crossing several faults in challenging and variable soft and hard ground conditions. The construction methods include SEM, hard rock drill and blast techniques, and a mechanized 8-foot (2.5 m) diameter microtunneled lake tap.
Citation
APA:
(2022) Construction Challenges of the Anderson Dam Tunnel Project - NAT2022MLA: Construction Challenges of the Anderson Dam Tunnel Project - NAT2022. Society for Mining, Metallurgy & Exploration, 2022.