Compensation and Jet Grouting as Mitigation Measures for a TBM Operation

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 8
- File Size:
- 6320 KB
- Publication Date:
- Jan 5, 2017
Abstract
"The Cityringen project in Copenhagen, Denmark will form a new circular line in the city center and will consist of 21 new stations (17 + four transfer stations) and approximately 31 km (19 miles) of earth pressure balance (EPB) twin-bored tunnels.The new tunnels passed under the historical building of Magasin du Nord, McDonald’s and two pubs in the heart of the city with a minimum cover of about 4 m (13 ft).To minimize the movements, a complex system of compensation grouting and jet grouting soil treatment was performed. A detailed action plan between the parties involved allowed coping with the critical tunnel boring machine’s (TBM) successful passage.The Cityringen is an extension of the existing metro line underground Copenhagen and will include the City Circle Line, 15 km (9.5 miles) of twin tunnels looping around the city. The City Circle Line will form a new circular track inside the city center and will intersect the existing M1 and M2 lines at Kongens Nytorv and Frederiksberg stations, as well as suburban train services at København H, Østerport and Nørrebro. It will extend the Metro network to the Nørrebro, Østerbro areas and the central station at København H (Fig.1). The two new lines M3 and M4 will run on the same tracks, but the M3 will be a circle route running around the entire line, whereas the M4 will drive from the station to the north side of the city.The €1.5 billion design-build contract was awarded by Metroselskabet in January 2011 to the Copenhagen Metro Team (CMT), a joint venture (JV) between the Italian companies Salini, Tecnimont Civil construction and Seli SpA. Since the bankruptcy of Seli SpA and Tecnimont, Salini Impregilo now owns 100 percent of the JV shares. Seli Tunneling Denmark ApS, a subcontractor to CMT, was initially constituted as a Seli SpA subsidiary and, following the economic difficulties of Seli SpA, was acquired in 2015 by Salini Impregilo. Seli Denmark is in charge of the tunnels excavation and lining and owns the four 5.84-m (19-ft) diameter Seli/Kawasaki earth pressure balance machines."
Citation
APA:
(2017) Compensation and Jet Grouting as Mitigation Measures for a TBM OperationMLA: Compensation and Jet Grouting as Mitigation Measures for a TBM Operation. Society for Mining, Metallurgy & Exploration, 2017.