Commissioning of the Ekati Diamond Mine

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 2
- File Size:
- 108 KB
- Publication Date:
- Jan 1, 1999
Abstract
"The BHP Diamonds Inc. and Blackwater Group (Dia Met Minerals Ltd., Charles Fipke and Stewart Blusson) joint venture began production at Canada=s first diamond mine during the last quarter of 1998.Construction of the processing plant began in mid 1997. During the 1998 winter season, the heavy process plant equipment was delivered to the Ekati site, 300 km NE of Yellowknife, by the ice road. Towards mid 1998 the construction activities were complete and commissioning began. The mine officially opened in October 1998.Initial production of 9000 tpd kimberlite will be from the Panda pipe grading 1.09 ct/t at an average value of US$13O/ct.Processing starts with a gyratory crusher reducing the ROM kimberlite to 90% passing 15Omm before further reduction to minus 75mm in a WaterFlush crusher. The crusher product discharges into a 4m diameter x 7m long primary scrubber. After screening, the minus 75 +1 mm kimberlite is conveyed to a 250 ft feed bin ahead of the 1.7 m diameter x 1.1 m wide high pressure grinding roll. The HPGR produces 50% minus lmm in a single pass, the compacted flake product is dis-agglomerated in a secondary scrubber. The scrubber product is screened into a minus 25 +lmm heavy medium separation plant feed and conveyed to a 375t HMS feed bin ahead of two 150 HMS modules. Milled 270D ferrosilicon at a slurry density of 2.6 g/cc and HMS feed are pumped to three 420mm diameter cyclones. Heavy mineral concentrates, approximately 1 % of the plant headfeed, are pneumatically transported to the Recovery plant for final diamond recovery using wet high intensity magnetic separators and high intensity (attrition) milling prior to three stages of x-ray recovery. At full production, Ekati will produce approximately 2 kg/day of diamonds.This paper details the later commissioning phase and the first three months Oof operational activities during the build up to full production at the Ekati processing plant."
Citation
APA:
(1999) Commissioning of the Ekati Diamond MineMLA: Commissioning of the Ekati Diamond Mine. Canadian Institute of Mining, Metallurgy and Petroleum, 1999.