Coal - Full Dimension Systems

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 4
- File Size:
- 758 KB
- Publication Date:
- Jan 1, 1961
Abstract
A relatively new haulage system is described. Employed by the Delmant Fuel Co.. the "Full Dimension" system provides an uninterrupted flow of coal from a loader or continuous miner at the face to the main line transportation system. This system is said to provide a higher percentage of recovery as well as additional safety and production. Delmont Fuel Co. is employing a comparatively new system of transportation known as a Full Dimension system. Cne of these systems has been in operation for a year at the company's 10-B Mine as a part of a conventional section. A second was installed at the No. 10 mine in late 1960 to handle the production of a Colmol in a pillar section. SYSTEM COMPONENTS A Full Dimension system is a haulage system that provides an uninterrupted flow of coal from a loader or continuous miner at the face to the main line transportation system. The equipment required for this system consists of a series of interconnected chain conveyors that are mobile and articulated. They will retract or extend a sufficient distance for the development of a five-entry system; or, in the Colmol pillar section, it provides reach of 210 ft in all directions from the section belt. The components of this system are: l)One 160-ft chain line placed in tandem with the belt conveyor. It has a self-propelled drive, is 20 in. wide and 9 in. deep. Moving this conveyor requires the assistance of a loading machine or cutting machine. 2) One 40-ft piggyback that discharges along the entire length of the 160 ft chain conveyor. 3) A mobile bridge carrier, which is a self-propelled conveyor with four wheel steer and four wheel drive, twenty-eight feet long, it delivers coal to the receiving end of the piggyback. Axles steer individually making possible almost lateral movement. 4) Another 40-ft piggyback, duplicate of item 2 that delivers coal along the entire length of item 3 (mobile bridge carrier). 5) A second mobile bridge carrier, similar to the first, which deliver coal to the piggyback (item 4). 6) A third 40-ft piggyback, duplicate of items 2 and 4. This pig is attached to the loading machine and delivers its coal along the length of the second mobile bridge conveyor. Since the original preparation of this paper, the Delmot Fuel Co. has been able to eliminate the 160-ft chain conveyor. This was accomplished by connecting the outby piggyback directly to a loading machine with an extended boom. The loading machine loads directly onto the belt. This change has resulted in a substantial reduction in moving time and greatly increased flexability. A single trailing cable powers the entire string of equipment. It is attached to the side of the equipment in such a way as to keep it off the ground and afford maximum protection. The tramming rate of this equipment is 90 fpm. The conveyor capacity in a conventional section at Delmont's mines is 7.5 tpm and in the Colmol section is 5.5 tpm. This regulation is a simple function of conveyor speed. To visualize operation of this equipment, it would be well for me to touch briefly on local conditions in the Upper Freeport seam in which we mine. (Also, see the photographs of some of the equipment in use.) DELMONT'S TOPOGRAPHY The Delmont Fuel Co. operates two mines in this seam in Westmoreland County, Pa. The No. 10 mine, which was opened in about 1912, is now almost worked out. Depending on economics in the industry, it has a life of two to four years on a declining production basis. A year ago a new drift mine was opened which is called No. 10-B. It is about two miles from the cleaning plant and is connected thereto by an overland belt conveyor. The new mine is being developed at a rate calculated to take up the slack as the old mine plays out. The Upper Freeport seam averages 4.2 ft in thickness in the area of the Delmont mines. It carries 4 in. of boney coal at the top of the seam and a middle man of from 2 to 4 in. We mine just above a 1-in. slate parting which has 4 to 6 in. of highly laminated coal beneath it. This material normally makes a very firm bottom. The roof varies from dark shale to sand rock and 36-in. bolts are placed on 4-ft centers for roof support. All working places are driven 20 ft wide on development and 25 ft wide on retreat. Selection of mobile chain conveyor equipment when it became available, was a very natural move for Delmont Fuel to make, because chain conveyors and piggybacks had been in use at the company's mines for about 12 years. Grades in the new mine
Citation
APA:
(1961) Coal - Full Dimension SystemsMLA: Coal - Full Dimension Systems. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1961.