Cement Deep Mixing in Lach Huyen Port Infrastructure Construction Project in Northern Vietnam

Deep Foundations Institute
Masakazu Takano Koji Suzuki Naotoshi Shinkawa
Organization:
Deep Foundations Institute
Pages:
10
File Size:
1339 KB
Publication Date:
Jan 1, 2015

Abstract

"Cement deep mixing (CDM) method successfully applied to a marine construction project in northern Vietnam is reported. The method is classified as wet method, in which cement slurry is injected into the ground. Thickness of clayey deposit subjected to improvement is from 20 m to 28 m, and the total volume of CDM improvement exceeds 460,000 m3. This is the first massive application of CDM method in the region. Three CDM barges, each equipped with four mixing shafts, were brought to the site in order to finish CDM work within a period of seven months. Cement content used in the work was 180 kg/m3 and water-cement ratio of slurry was 100%. Unconfined compression strength of stabilized soil was 1,200 kPa to 1,600 kPa in average with coefficient of variation from 0.3 to 0.4. Statistics analysis of the strength with these values gave percentage of lower strength less than 10%. Trial use of needle penetration test performed to study strength profile of a CDM column is also reported.INTRODUCTIONThe site of Lack Huyen Port Infrastructure Construction Project is located in the sea adjacent to Cat Hai Island, offshore Hai Phong city which is around 100 km east of Hanoi, the capital of Vietnam. Left side of Fig. 1 shows the location of the site. The project contains development of container terminal, dredging of waterway, construction of sand protection dyke to prevent waterway from being buried, and bridge construction to connect the island to the mainland.Joint venture of Penta Ocean Construction and Toa Corporation was awarded Package 6 of the project, in which reclamation of container terminal area, retaining wall construction and terminal road construction were included. Plan of the site is presented in right side of Fig. 1. The site work has been started in June 2013 and is scheduled to finish within 4 years."
Citation

APA: Masakazu Takano Koji Suzuki Naotoshi Shinkawa  (2015)  Cement Deep Mixing in Lach Huyen Port Infrastructure Construction Project in Northern Vietnam

MLA: Masakazu Takano Koji Suzuki Naotoshi Shinkawa Cement Deep Mixing in Lach Huyen Port Infrastructure Construction Project in Northern Vietnam. Deep Foundations Institute, 2015.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account