Case History of a Site Reevaluation for a Plant Expansion

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 4
- File Size:
- 366 KB
- Publication Date:
- Jan 1, 1983
Abstract
Environmental constraints can both delay and raise the cost of a major plant addition, often requiring a complete reevaluation of the plant site and the proposed project. In this case history, steps are presented which were followed in applying for environmental permits for a major addition to a lime plant. Methods are described for determining expected emission increases and for selecting the best control technology for each source. The description progresses through pre-application conferences with control agencies, the formal application procedure, computer modeling the air quality impact, and the methods followed in obtaining a favorable determination.
Citation
APA:
(1983) Case History of a Site Reevaluation for a Plant ExpansionMLA: Case History of a Site Reevaluation for a Plant Expansion. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1983.