Capacity Enhancement at Newmont Mining Corporation’s Twin Creeks Whole Ore Pressure Oxidation Facility

Canadian Institute of Mining, Metallurgy and Petroleum
M. Eichhorn T. Krumins L. Zunti F. C. Ruff
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
15
File Size:
1042 KB
Publication Date:
Jan 1, 2014

Abstract

Hatch Ltd. has recently completed a project to increase refractory gold ore processing capacity at Newmont Mining Corporation’s Twin Creeks facility. The objective of the project was to increase throughput by approximately 10% by adding a third autoclave feed pump to each of the two autoclave circuits. To minimize project capital cost, autoclave feed pumps from Newmont’s decommissioned Lone Tree facility were evaluated and found to be suitable for this new service. The existing pressure oxidation circuit was reviewed in a debottlenecking study to determine other upgrades required to facilitate the increased throughput. Interruption to operations was minimized with a detailed construction plan, supplemented with detailed 3D layout model sequencing studies. The focus of this paper is project development, multi-discipline design considerations, and implementation results.
Citation

APA: M. Eichhorn T. Krumins L. Zunti F. C. Ruff  (2014)  Capacity Enhancement at Newmont Mining Corporation’s Twin Creeks Whole Ore Pressure Oxidation Facility

MLA: M. Eichhorn T. Krumins L. Zunti F. C. Ruff Capacity Enhancement at Newmont Mining Corporation’s Twin Creeks Whole Ore Pressure Oxidation Facility. Canadian Institute of Mining, Metallurgy and Petroleum, 2014.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account