Bradshaw Section 5A Interceptor, Sacramento, California

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 18
- File Size:
- 7520 KB
- Publication Date:
- Jan 1, 1999
Abstract
The Bradshaw Section 5A Interceptor involves the construction of two miles of 108-inch, finished diameter tunnel in dry soils. Excavation is generally by Lovat TBM with ribs and lagging support. The tunnel is beneath a recreational parkway and stringent measures have been enacted to preserve the parkway and minimize disruption to the neighborhood. Apart from these constraints, the project would have been unremarkable but for the intervention of CalOSHA and the local fire department who ordered extraordinary fire protection measures. The paper discusses the cause and effect of these measures and comments on the potential repercussions for other projects.
Citation
APA:
(1999) Bradshaw Section 5A Interceptor, Sacramento, CaliforniaMLA: Bradshaw Section 5A Interceptor, Sacramento, California. Society for Mining, Metallurgy & Exploration, 1999.