Boston Outfall Tunnel

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 558 KB
- Publication Date:
- Jan 1, 1993
Abstract
Right in the heart of Boston Harbor lies Deer Island, where a ten-year, 6 billion dollar sewage treatment plant is under construction. The 9.5 mile long, 25.5' diameter Effluent Outfall Tunnel is the center piece of this program. A Robbins double-shielded TBM is currently driving this challenging tunnel some 400 feet below sea level. This paper will discuss the set-up and operation of this Tunnel Boring Machine in driving the longest single heading tunnel ever built in North America.
Citation
APA:
(1993) Boston Outfall TunnelMLA: Boston Outfall Tunnel. Society for Mining, Metallurgy & Exploration, 1993.