Bof Blowing Process Challenges For High Rate Of Iron Ore Pellet Addition - Process Development And Results At Tkcsa

Associacao Brasileira de Metalurgia,  Materiais e Mineracao
Daniel Augusto Godinho de Carvalho
Organization:
Associacao Brasileira de Metalurgia, Materiais e Mineracao
Pages:
9
File Size:
1342 KB
Publication Date:
Oct 30, 2017

Abstract

At thyssenkruppCSA, a positive heat balance at BOF process is faced, mainly because of low utilization of scrap and plant design. A singular logistic concept for hot metal transport between blast furnace and steel plant was established to optimize transportation and energy balance. Up to 80 kg of iron ore pellets/t steel is necessary for 340t BOF heat balance. In order to accomplish this challenge a stable blowing process, intensive operational development have been successfully executed: slopping rate reduction of 80% achieved without changing the blowing time. This paper describes steps and results of this development.
Citation

APA: Daniel Augusto Godinho de Carvalho  (2017)  Bof Blowing Process Challenges For High Rate Of Iron Ore Pellet Addition - Process Development And Results At Tkcsa

MLA: Daniel Augusto Godinho de Carvalho Bof Blowing Process Challenges For High Rate Of Iron Ore Pellet Addition - Process Development And Results At Tkcsa. Associacao Brasileira de Metalurgia, Materiais e Mineracao, 2017.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account