Blasting the Fulton Bottom River Crossing

International Society of Explosives Engineers
E Emery Jr Gray
Organization:
International Society of Explosives Engineers
Pages:
5
File Size:
111 KB
Publication Date:
Jan 1, 1979

Abstract

The City of Richmond, in an effort to improve sewage treatment facilities, designed an invert syphon to cross the James River at Fulton Bottom. The design criteria called for installation of two 36-inch pipe' lines at an elevation of -35 with the mean water level being at elevation 00. This paper discusses the actual method of construction used to blast the river bottom. Choice of excavation equipment, nature of the river, as well as the geological structure, were taken into consideration.
Citation

APA: E Emery Jr Gray  (1979)  Blasting the Fulton Bottom River Crossing

MLA: E Emery Jr Gray Blasting the Fulton Bottom River Crossing. International Society of Explosives Engineers, 1979.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account