The blasting program at the Valdez Creek Placer Mine must deal with challenging situations throughout the year. During the short summer, extreme water conditions must be confronted, while the winter months present problems of a different nature, where the overburden freezes to a depth of up to 18 feet. These obstacles require techniques borrowed from hardrock blasting combined with creative experimentation to overcome.
Citation
APA:
(1994) Blasting at the Valdez Creek Placer Mine, a Cost Savings Design for Sub Arctic ConditionsMLA: Blasting at the Valdez Creek Placer Mine, a Cost Savings Design for Sub Arctic Conditions. International Society of Explosives Engineers, 1994.