Big Walnut Sanitary Trunk Sewer Extension Project

Society for Mining, Metallurgy & Exploration
Tanya Arsh Heather Marsh Barry Doyle Thomas P. Kwiatkowski
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
505 KB
Publication Date:
Jan 1, 2001

Abstract

The Big Walnut Sanitary Trunk Sewer Extension Project consists of two segments, the first a 10' excavated diameter tunnel in rock through the gas producing Ohio Shale formation and the second will be microtunneled through unconsolidated water-bearing deposits. Relatively large quantities of methane gas have been encountered in the Ohio Shale. In the softground segment, the sands and gravels contain large water storage capacity and contain shallow residential wells. This paper will present an evaluation of potential gas inflows in the rock tunnel, design considerations for contract documents preparation to inform bidders as to the volumes of gases which may been countered and design options for construction of an impermeable shaft excavation support system to insure residential wells remain in service.
Citation

APA: Tanya Arsh Heather Marsh Barry Doyle Thomas P. Kwiatkowski  (2001)  Big Walnut Sanitary Trunk Sewer Extension Project

MLA: Tanya Arsh Heather Marsh Barry Doyle Thomas P. Kwiatkowski Big Walnut Sanitary Trunk Sewer Extension Project. Society for Mining, Metallurgy & Exploration, 2001.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account