Batch Autoclave Operation & Costs

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 4
- File Size:
- 917 KB
- Publication Date:
- Jan 1, 2000
Abstract
The Stillwater Mining Company Base Metals Refinery (BMR) leaches a PGM bearing nickel/copper smelter matte to produce a concentrated platinum/palladium filtercake. The BMR employs a two-stage sulfate based leaching process. The first stage (nickel atmospheric leach circuit) leach is performed under atmospheric conditions at elevated temperature to leach the majority of the nickel present in the matte feed. Approximately 85% of the solids mass fed to first stage leach report to the second stage (pressure leach circuit) leach. The pressure leach circuit consists of two batch autoclaves in parallel. Each autoclave has a separate feed tank. This paper will describe the second stage leaching process and report associated operating costs.
Citation
APA:
(2000) Batch Autoclave Operation & CostsMLA: Batch Autoclave Operation & Costs. Society for Mining, Metallurgy & Exploration, 2000.