Application Of Uni-Delay Shock Tubes In Development In Underground Mines - Synopsis

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 25
- File Size:
- 543 KB
- Publication Date:
- Jan 1, 2008
Abstract
This paper describes the concept and development of the use of a uni-delay shock tube system in the timing and initiation of the development rounds, specifically in flat development. It was extended from stoping and now constitutes the only initiation system is use at Kopanang mine. The two explosives initiation systems in general use in underground mines are the conventional fuse-igniter cord system, and the more modern Long Period Delay shock tube system, better known as the numbered LP system. Both are well accepted but have many drawbacks which can result in poor breaking and substantial wastage of the blasting material. Both of these deficiencies cause an increase in the cost of a blast. Hitherto, the limited number of delays available has complicated the use of shock tubes in development blasting. Over eighteen month period to the end of 2007, a project team comprising members from Kopanang Mine and AEL developed a method for the use of a uni-delay shock tubes to time any development round. These uni-delay shock tubes are better known as Reef Masters® or EZ-Stopers® depending on the supplier, and the system has particular application in flat development. During the project, two new shock tube system components were designed, tested and manufactured; namely Splitters and Starter Packs. The system has been successfully tested and implemented in both on-reef and off-reef development ends. At Kopanang, it has now been rolled out across the entire mine. Other AnglogoldAshanti mines are conducting trials and implementations into production sections. Initial results indicate improvements in the ground conditions and excavation profiles. The cost of blasting is showing a downward trend. The authors consider that the system is a tool for use in further blast optimization and will contribute to rationalization of the explosives commodities basket on mines.
Citation
APA:
(2008) Application Of Uni-Delay Shock Tubes In Development In Underground Mines - SynopsisMLA: Application Of Uni-Delay Shock Tubes In Development In Underground Mines - Synopsis. The Southern African Institute of Mining and Metallurgy, 2008.