Appendix G - Table Ix - Mine A

- Organization:
- The National Institute for Occupational Safety and Health (NIOSH)
- Pages:
- 9
- File Size:
- 162 KB
- Publication Date:
- Jan 1, 1976
Abstract
APPENDIX G TABLE IX MINE A 1 General Total Employees 3000 Maximum No, of Men Underground/Shift 800 Shifts/Day 3 Type of Ore Copper Daily Production (TPD) 25,000 Mining Method Room and Pillar Vein Dip/Thickness l0°/l5 ft Number of Levels/Max Depth 1/0 to 1800 ft 2 Haulage, Conveyances and Travelway Main Haulage Rubber Tire/10 miles belts Man-Ways - Typical Route of Travel to most Remote Sites Rubber Tired Vehicles Hoists - Capacity/Speed/Depth Depth under construction 3 Ventilation 2,500,000 cfm - 5 surface fans 4 Compressed Air N/A cfm 10" and 12" lines 5 Incendiary Storage 2 day powder 1000 gal fuel oil 6 Communications 1 complete system - all shops, dinner areas, and feeder/breaker stations 2 partial systems 7 Escapeway- Systems Man Check System Section boss log and punch cards Alarm System Mine phones with paging system Posting of Escape Route Maps No Escape Signs Every intersection, fluorescent paint Evacuation Drills 2/yr/shift Refuge Chambers - 1 cinder block - No longer required
Citation
APA:
(1976) Appendix G - Table Ix - Mine AMLA: Appendix G - Table Ix - Mine A. The National Institute for Occupational Safety and Health (NIOSH), 1976.