An Overview Of Materials Testing Relevant To Backfilling At Vaal Reefs Gold Mine

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 15
- File Size:
- 455 KB
- Publication Date:
- Jan 1, 1988
Abstract
Backfilling at Vaal Reefs during the experimental phase has been carried out using cyclone-separated tailings which are transported underground hydraulically by means of a borehole. The selected tailings are piped from the borehole to the stope and then, after the addition of a flocculant, deposited in place via single or multiple nozzles. The successful performance of the backfill/stope system relies not only on the actual quality of the placed material, but also on the effective operation of stope filling. The success of stope filling relates to the complex, time- dependent interaction of backfill, stope and barricade materials, and the transport and placement procedures used. A comprehensive laboratory testing programme was carried out on backfill materials at Vaal Reefs in conjunction with the experimental stope- filling operation. The range of testing techniques corresponds to the requirements of each stage of the backfilling process. Where necessary, new or alternative techniques were sought during the course of the experiment to satisfy and facilitate better understanding of the different processes. These techniques comprise both routine quality control testing and research-oriented testing. The laboratory testing techniques appropriate to each stage of the backfill process are briefly discussed. This paper presents the main conclusions of the study and identifies areas for further research.
Citation
APA:
(1988) An Overview Of Materials Testing Relevant To Backfilling At Vaal Reefs Gold MineMLA: An Overview Of Materials Testing Relevant To Backfilling At Vaal Reefs Gold Mine. The Southern African Institute of Mining and Metallurgy, 1988.