Abstract
The Laronde mill was commissioned in 1988 and has been treating the Laronde Perim ore since 2000. The Laronde plant, situated in the Abitibi region of Quebec, has experienced mill expansions to accommodate 7500 mtpd and to recover gold and silver as well as important amounts of base metals (Cu, Zn, Pb). Ten sequential metallurgical and environmental processes are responsible for metals recovery and process viability. Over 200,000 ounces of gold, 4,5 million ounces of silver, 7000 tonnes of copper, and 78,000 tonnes of zinc are produced annually. In 2008, the Goldex plant began trucking high wade (35-45 Wt Au) pyrite sulphide concentrate (TCGO) for gold extraction at a newly constructed treatment plant, increasing gold output at Laronde by 40,000 ounces. In 2009, the high gold wade Lapa ore processing facilities were annexed to the Laronde plant increasing output by 120,000 ounces of gold. TCGO and Lapa productions are forecasted until 2018 and 2015 respectively, with known reserves of each mine. Today, up to 140 permanent employees run and optimise the Laronde plant operation. As a result, Laronde has intricacies intrinsic to a large and varied operation. The paper will outline the metallurgical highlights, challenges, and future outlook related to the treatment of each ore type (Laronde, TCGO, and Lapa)
Citation
APA:
(2011) Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and FutureMLA: Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and Future. Canadian Institute of Mining, Metallurgy and Petroleum, 2011.