Aggregate Size Optimisation Program at the Lafarge Marblehead Plant

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 3
- File Size:
- 129 KB
- Publication Date:
- Jan 1, 2007
Abstract
The Lafarge Marblehead Plant in Marblehead, Ohio, USA produces 4.2 million tonnes of sized aggregate yearly. In 1997, a program was instituted to maximise primary crusher productivity through the optimisation of blasting variables and procedures. A proprietary blasting shot report database and the Lafarge production database was statistically analysed to provide guidance in the program. Blasting powder factor (kg/m3) was the main control variable utilised to increase crusher throughput. In 2005, the program was refined to increase the production of certain high margin aggregate sizes and the reduction of fines. The principal blasting component affecting the percentage of high margin size production appears to be pattern area (burden and spacing area). This can be coupled with powder factor to optimise the production rate of high margin aggregate sizes. The size optimisation program incorporates the blasting shot report database, Lafarge production database, statistical analysis and aggregate sampling. A preliminary indication is that the production of high margin sizes (12.7 mm X 4.8 mm, 24.4 mm X 12.7 mm, and 50 mm X 25.4 mm) has been increased seven to 12 per cent utilising these techniques. As an added benefit, blasting costs have been reduced linearly as burden û spacing pattern areas have increased and powder factors have decreased. The program is ongoing and will investigate other blasting procedures and variables including electronic blasting caps to further increase the production of high margin products. The statistical methods involved in the analysis are described in this article for use in other mines and situations. The methods described can be used to optimise crusher throughput, digging rates and product size.
Citation
APA:
(2007) Aggregate Size Optimisation Program at the Lafarge Marblehead PlantMLA: Aggregate Size Optimisation Program at the Lafarge Marblehead Plant. The Australasian Institute of Mining and Metallurgy, 2007.