A Two-Step Model to Optimize the seMI-Mobile In-Pit Crusher Locations and the Mine Schedule

Society for Mining, Metallurgy & Exploration
Alireza Kamrani Hooman Askari-Nasab Yashar Pourrahimian
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
19
File Size:
1238 KB
Publication Date:
Jun 25, 2023

Abstract

In-pit crushing and conveying (IPCC) is an option to decrease the enormous operating costs that a truck shovel can introduce in an open-pit mine. Finding the best locations for the IPCC over the mine life will impose a new set of requirements for the mine planning. Through a two-step mathematical programming model alongside the road network, this method finds the optimal in-pit crusher locations and relocation times first and then optimizes the long-term mine schedule. The model is verified by a real mine. The results show that the truck travel time could be reduced by 500% and the discounted cash flow increased by 8% with an optimized schedule considering the crusher placement.
Citation

APA: Alireza Kamrani Hooman Askari-Nasab Yashar Pourrahimian  (2023)  A Two-Step Model to Optimize the seMI-Mobile In-Pit Crusher Locations and the Mine Schedule

MLA: Alireza Kamrani Hooman Askari-Nasab Yashar Pourrahimian A Two-Step Model to Optimize the seMI-Mobile In-Pit Crusher Locations and the Mine Schedule. Society for Mining, Metallurgy & Exploration, 2023.