A Summary of Load Test Results on Large Diameter Open-Ended Pipe Piles in Minnesota

- Organization:
- Deep Foundations Institute
- Pages:
- 10
- File Size:
- 565 KB
- Publication Date:
- Jan 1, 2017
Abstract
"Since 2010, the Minnesota Department of Transportation (MnDOT) has performed eight full-scale compressive load tests on large-diameter pipe piles at four different project locations across the state. All of the piles were 42-in diameter, open-ended pipes driven to practical refusal on sedimentary bedrock with D125-32 diesel hammers from three separate manufacturers. The rapid load test method in general accordance with ASTM D7383-10 (Statnamic method) was used along with high-strain dynamic testing and subsequent signal matching. Results of these tests indicate that the axial nominal resistance of these piles in compression is not controlled by geotechnical considerations when driven with an appropriately sized hammer and installation criterion. Rather, the predominantly elastic load-deflection behavior of the piles under compressive load suggests the axial nominal compressive resistance is controlled by the structural capacity of the pile. In all instances, the rapid load tests indicated a nominal resistance exceeding that produced by high-strain dynamic tests due to insufficient hammer energy to fully mobilize resistance. In all cases, the hammers used were able to easily install the piles through the soil overburden. Mobilizing a larger hammer simply to demonstrate high-strain dynamic resistance is not economical or practical. This paper presents the subsurface conditions at each location, the ensuing test results, and the ramifications for future projects in Minnesota utilizing large-diameter open-ended pipe piles.INTRODUCTIONThe Minnesota Department of Transportation (MnDOT) has recently performed eight full-scale compressive load tests on large-diameter pipe piles at four different project locations across the state. The four project locations described in this paper where pile load testing was performed are shown in Figure 1 and exist in the southeastern portion of Minnesota. The projects are all major bridges crossing the Mississippi River in three instances and the St. Croix River just above the Mississippi River in the other instance. The first project is the TH 61 Mississippi River crossing in Hasting, MN where two load tests were conducted. The second is the TH 36 St. Croix River crossing in Stillwater, MN where two load tests were performed. The third project is the I-90 Mississippi River crossing in Dresbach, MN where three load tests were conducted. The final project is the TH 43 Mississippi River crossing in Winona, MN where one load test was performed."
Citation
APA:
(2017) A Summary of Load Test Results on Large Diameter Open-Ended Pipe Piles in MinnesotaMLA: A Summary of Load Test Results on Large Diameter Open-Ended Pipe Piles in Minnesota. Deep Foundations Institute, 2017.