A Small Diameter Shaft Design Alternative

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 197 KB
- Publication Date:
Abstract
During early stages of the detailed design for Detroit?s Upper Rouge CSO Tunnel Project, a Value Engineering Recommendation suggested the design team investigate alternative concepts to the usual cast-in-place or precast concrete lining system for the Project?s many smaller diameter Deaeration Vent Shafts. The resulting design investigation produced not only an alternative lining system, but lead to a proposed non-conventional approach to shaft installation means and methods through soil and rock necessary to construct the permanent shaft lining system. This paper will outline and summarize the technical issues, contractual restrictions, and cost considerations that eventually lead to the final shaft design