A Review of the Grouting Online 2 of the Cairo Metro

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 25
- File Size:
- 354 KB
- Publication Date:
- Jan 1, 1997
Abstract
This paper presents a review of the grouting works of Line 2 of the Greater Cairo MetroSystem. The Nile River alluvial deposits underlying this ancient city provided for a challenging and sometimes difficult grouting project. Permeation grouting using state-of-the-art computerized grouting techniques, as well as extensive ground treatment by jet grout, was per-formed for soil consolidation and/or groundwater control. During the project, over 425,000m3 of ground was treated, requiring 1.4 million linear meters of drilling and PVC injection pipe, 54,000 m3 of bentonite cement and 230,000 m3 of chemical and mineral grout. In addition, over 70,000 m3 of ground was treated using the jet grout method. Relative to major international transportation projects, the grouting works for Line 2 of the Cairo Metro represent one of the largest worldwide grouting endeavors to date.
Citation
APA:
(1997) A Review of the Grouting Online 2 of the Cairo MetroMLA: A Review of the Grouting Online 2 of the Cairo Metro. Society for Mining, Metallurgy & Exploration, 1997.